Representative project experience across power generation, oil & gas, wastewater, and industrial facilities — from targeted repairs to full-scope turnkey installations.

$7M+ Completed Project Value
15,000+ Circuits Installed
20+ States Served
ZERO Safety Incidents
Featured Work

Representative Projects

A sample of project types Patriot has delivered across industrial sectors. Client names are confidential — contact us for specific references relevant to your industry.

Additional Experience

Work Across Industrial Sectors

Representative project types by industry — a cross-section of the work Patriot delivers.

Power Generation

Gas Turbine Plant — Emergency Circuit Repair

Emergency response to multiple ground fault failures during cold weather event. Patriot mobilized within 24 hours, diagnosed and repaired 12 circuits, and delivered updated test records within 48 hours of completion.

Emergency Response Repair Chromalox
12 Circuits
Oil & Gas

Terminal Facility — Heat Trace Insulation Audit & Assessment

Full heat trace and insulation audit for a petroleum terminal — 200+ circuit inspection with megger testing, insulation condition assessment, and a prioritized repair plan with estimated costs by risk category.

Audit Insulation Risk Scoring
200+ Circuits Audited
Renewable Energy

Solar Generation Facility — Freeze Protection Design & Install

New construction freeze protection installation for a utility-scale solar facility — instrument winterization, inverter enclosure heating, and drain protection for weather stations and monitoring equipment. Full design, material procurement, and installation by Patriot.

New Construction Design-Build nVent Raychem
New Construction
Chemical Processing

Chemical Plant — Process Temperature Maintenance Installation

Constant watt heat trace installation for viscous chemical feed lines requiring continuous temperature maintenance. Hazardous area classification required explosion-proof terminations and Class 1 Division 1 rated components throughout.

Constant Watt Class 1 Div 1 Process Temp
C1D1 Rated Install
Industrial / Commercial

Manufacturing Campus — System Expansion & Documentation Rebuild

Legacy heat trace system without documentation expanded and brought current — Patriot surveyed the existing system, created as-built drawings from field measurements, megger tested all circuits, and installed new circuits for a facility expansion.

Expansion Documentation Rebuild As-Builts
Legacy System Documented
Wastewater

Industrial WWTP — Insulation Repair & Replacement Program

Multi-phase insulation repair program targeting CUI-risk pipe sections across an industrial wastewater treatment facility. Jacketing replacement, vapor barrier repair, and new insulation at pipe supports to eliminate moisture ingress points.

Insulation CUI Prevention Multi-Phase
Multi Phase Program
Track Record

The Numbers Behind the Portfolio

Every project in Patriot's portfolio closed with complete documentation, a megger-tested system, and zero safety incidents. That's not a marketing claim — it's the standard we hold ourselves to on every job.

$7M+ Completed Project Value
15K+ Circuits Installed & Documented
20+ States Across the US
ZERO Lost-Time Safety Incidents
What Every Project Gets

Standards That Don't Change Job to Job

Regardless of project size or sector, every Patriot engagement delivers the same standard of work, documentation, and accountability.

01

Self-Performed by Our Own Crew

Every Patriot project is performed by Patriot's licensed electricians and trained field crew. No subcontractors, no temp labor — the team that shows up is our team, with our training and our standards.

02

Full Documentation at Closeout

As-built drawings, megger test records, panel schedules, commissioning reports, and manufacturer warranties — organized and delivered before we leave the site. Your facility has everything it needs from day one.

03

Zero Safety Incidents

Patriot has maintained a zero lost-time injury record since founding. On every project, OSHA protocols are enforced, job hazard analyses are completed before work begins, and the site is left cleaner than we found it.

$7M+ Projects Completed
Your Project Is Next

Add Your Facility to the Portfolio

Whether you're planning a new installation, managing a repair backlog, or trying to get your system documented before cold season — contact Patriot and let's talk scope.